Soft-story retrofit · building owners

Got a compliance order? Here's how it gets done.

Los Angeles and several neighboring cities require owners of wood-frame buildings with tuck-under parking to complete a seismic retrofit by set deadlines. We're a licensed general contractor handling these projects end to end — engineering coordination, permits, construction with tenants in place, and city sign-off.

Earthquake Soft-Story — FEMA-Trained contractor badge

FEMA-Trained · Earthquake Soft-Story program contractor

What "soft-story" means for your building

A soft story is a ground floor with big openings — usually parking bays — and not enough wall to hold the building steady sideways. In strong shaking, that level can collapse under the floors above. The fix is engineered strengthening: steel frames or new walls at the open bays, tied into the foundation.

Apartment building with tuck-under parking — a typical soft-story structure

Assessment & engineering

We review your compliance order and your building, then work with the structural engineer on a design that meets your city's rules — without over-building past what's required.

Permits & plan check

We carry the plans through the building department, handle their corrections, and keep you posted on the deadline clock the whole way.

Construction, tenants in place

The work concentrates at the parking level. We stage it so units stay occupied, then close out with city inspection and your compliance paperwork.

What owners want to know

My deadline is coming up — how long does the whole process take?

Engineering and permitting usually take longer than the construction itself. Total timelines run months, not weeks — so the biggest risk to your deadline is waiting to start. If you've received an order to comply, the assessment conversation should happen now.

Do tenants have to move out?

Almost never. The structural work happens at the parking level. Parking is disrupted in phases; the units stay occupied.

Can retrofit costs be passed through or financed?

Programs and cost-recovery rules vary by city and change over time — LA has had rent-adjustment provisions for required retrofits. We'll point you to the current details for your building's city; confirm specifics with the housing department or your attorney.

What does it cost?

It depends on the building — real numbers require the engineering. What we commit to: a fixed construction quote off the approved plans, itemized, before work begins.

Start with the assessment

Bring us your compliance order — we'll walk the building, explain your options in plain terms, and map the timeline to your deadline. Send your info below or call (323) 521-9009.

No spam, no sales list — we call once to schedule, that's it.

✓ Got it — we'll call you the same business day. Talk soon.
Something went wrong sending that. Please call us instead: (323) 521-9009
Call (323) 521-9009 — Free Inspection